Southern Cold Storage

Location
Gadsden, Alabama
Project Size
70,778 SF
Completion Year
2012
Southern Cold Storage

This cold-storage distribution facility is physically connected to Keystone Foods’ poultry processing plant via a 100-foot refrigerated corridor. Rather than being temporarily stored in pallet racks in a holding freezer and then shipped, Keystone Foods’ finished goods are simply palletized and moved on a conveyor through the connecting corridor and into the cold-storage facility.

The conveyance tunnel between the plant and the distribution center is refrigerated and provides proper air balance to ensure efficient temperature control. The facility’s floor consists of a shrinkage-compensating concrete slab, which significantly reduces floor joints, decreasing wear and tear and lowering overall maintenance costs. A Quell Fire Sprinkler System, which does not rely on in-rack sprinklers or anti-freeze, was also installed.

Key Team Members

ÌìÃÀÂ鶹's leadership has the expertise and understanding necessary to advise you, even on the most complex challenges.

Meet ÌìÃÀÂ鶹's Leadership Team
Next Slide